-
Jianghan Petroleum Engineering has successfully applied a newly developed drilling fluid system independently
Our newspaper news: Recently, the cementing operation of Jiaoye 9-12HF well in Jiaoshiba block of Fuling shale gas field was successfully completed, marking the first successful application of the com···
2025-11-05 -
Henan Oilfield fills the technological gap in drilling complex fault block thin-layer long horizontal wells
Our newspaper reports, by Chang Huanfang and Shao Zhifang: Recently, the Bi 125-2H well, which was deployed in the eastern part of the Bi 125 fault block in Gucheng Oilfield, was successfully drilled.···
2025-11-05 -
Huabei Petroleum Engineering Company sets the shortest drilling cycle record in Shunbei Oil and Gas Field
According to our report, on March 9th, the 90103HB drilling team of the Western Branch of North China Petroleum Engineering successfully completed the drilling construction task of the SHZ4-5X well in···
2025-11-05
-

电话:0559-7778222
传真:
-

总部:No. 1 Fenglin Road Xiuning Economic Development Zone, Huangshan City, Anhui Province, China
邮编:245400
-

E-mail:china@yzhnsh.com
www.yzhnsh.com
-

微信公众号
-
致电
咨询电话:0559-7778222
-
微信
咨询
扫码免费咨询
-
回到
顶部
